Curated historic collection · Historic evidence guide

Executive Order 9024: Establishing the War Production Board in the Executive Office of the President and Defining Its Functions and Duties

President: Franklin D. Roosevelt · Trade, tariffs and industry

Roosevelt created the War Production Board to coordinate industrial output and allocation for the Second World War.

Research depth: Expanded historical analysis. About this collection

Status: Completed/expired.

Is Executive Order 9024 still in effect? No. Executive Order 9638, signed October 4, 1945, terminated the War Production Board established by Executive Order 9024 and transferred its functions to the Civilian Production Administration. The termination took effect at the close of business on November 3, 1945.

Signed
January 16, 1942
President
Franklin D. Roosevelt
Topic
Trade, tariffs and industry
Current position
Completed/expired
Symbolic editorial illustration for EO 9024; not a photograph
Editorial illustration · generated for this guide · not documentary evidence

What the order directed

The board set production priorities, allocated scarce materials and coordinated procurement and industrial conversion. Later orders expanded its powers; this founding text was one part of wartime production policy.

Why it was signed

Roosevelt signed EO 9024 on January 16, 1942, after Congress had declared war in December 1941. The order established the War Production Board within the Office for Emergency Management, itself in the Executive Office of the President. Its broad wartime procurement assignment is distinct from the later detailed allocation controls created under subsequent instruments. Original text.

The founding order included the Secretaries of War and Navy and senior production, price and defense-aid officials as board members, with a presidentially appointed chair. This interagency composition placed procurement and manufacturing decisions in a coordinating forum. It did not itself make the entire private economy a federal department. Board composition.

NARA’s record group describes the board as superseding the earlier Supply Priorities and Allocations Board, and its later January 24 order as superseding the Office of Production Management. The two dated steps are important: EO 9024 did not on January 16 alone abolish every precursor named in the January 24 arrangement. NARA organizational history; EO 9040.

What the text authorized

Paragraph 2 gave the chair general direction over war procurement and production. It covered interagency policy, plans and methods for purchasing, contracts, construction, conversion, requisitioning, plant expansion and financing. These are specified administrative fields; the guide should not attribute every later rationing rule or individual factory outcome directly to the founding text. Paragraph 2.

The order assigned the old Supply Priorities and Allocations Board’s functions to the new chair and allowed supervision of the Office of Production Management. These transfers show a consolidation of existing capacity, not creation of supply-management powers from nothing. The chair also had to report to the President on production progress. Signed paragraphs 2 and 7.

Paragraph 3 required federal agencies to comply with the chair’s policies and provide necessary procurement and production data. The Army and Navy Munitions Board was to report through the chair. This established a chain of federal coordination while leaving the separate agencies in existence. EO 9024 paragraphs 3–4.

The chair could exercise authority through selected officials and employ personnel within available funds. The order abolished the Supply Priorities and Allocations Board, transferred its records and property, and amended listed prior orders to resolve conflict. It did not appropriate unlimited money or make production decisions immune to later statutory change. Founding order.

What happened in practice

Roosevelt’s January 24 EO 9040 defined additional board functions and restructured the Office of Production Management relationship. This was a direct later legal change to the new institution only eight days after its creation. Reading the January 16 text alone therefore understates how quickly the operating framework evolved. EO 9040; NARA agency history.

EO 9125 in April 1942 granted the chair additional authority under Title III of the Second War Powers Act. The statute and later order are separate sources of authority; those powers should not be backdated to EO 9024. This matters when assessing a particular priority or allocation measure from later in the war. EO 9125.

NARA’s War Production Board finding aid documents an agency with records for materials, industrial branches and production administration. Such records substantiate that the board operated beyond the founding order; they do not support a single simple total for every item produced. Product counts require the relevant archival series and period. WPB records.

Truman signed EO 9638 on October 4, 1945, providing for the board’s abolition effective November 3 and transferring functions, staff and records to a Civilian Production Administration. Its purpose included an orderly transition to peacetime production. The signing date and effective date are different and should not be collapsed into September 1945. EO 9638; NARA history.

NARA preserves minutes for the older Supply Priorities Allocation Board, the Office of Production Management council, the WPB itself and its Requirements Committee. That archival series is a concrete check on the consolidation described in EO 9024: some committees and files began before January 1942 and continued into the successor era. It does not follow that every meeting minute was a presidential decision. NARA RG 179 organizational records.

The National Archives inventories WPB equipment, limitation, conservation, preference, rubber and utility orders, with gaps in the surviving series. These are examples of the later implementing instruments needed to analyze an allocation’s effect on a product. The founding order does not state a particular rationed quantity; even an archive category alone does not prove how much an individual business produced. NARA orders and regulations.

EO 9638 transferred functions and powers along with employees, records and property to the Civilian Production Administration, but excluded the WPB chair and other board members from the transfer. This distinction matters for continuity: staff and administrative records could carry forward while the old governing board ended. The successor order explicitly aimed at reconversion from wartime to peacetime production. Truman Library successor text.

Reaction and legacy

The board is a terminated wartime agency, but some powers were transferred rather than vanishing the instant its name ended. Truman’s successor administration inherited transition tasks; the September/October 1945 order did not convert the War Production Board into a permanent present-day regulator. Successor order.

The verified causal chain is January creation, later wartime expansions and November 1945 dissolution. Claiming EO 9024 alone dictated a particular manufacturer’s quota would require an implementing directive or company record. The archival finding aid points to records suited to that more specific question. Original; NARA records.

This order illustrates presidential management of a declared war economy through named agencies. Board membership and directives governed federal coordination; later statutes and orders supplied additional legal tools. Its status is therefore historically completed while its records remain useful evidence of implementation. EO 9024; EO 9125.

A board at the start of total war production

EO 9024 established the War Production Board in January 1942, after the United States entered the war. It placed a chairman and board within the existing emergency-management structure and assigned overall direction for procurement and production. The text is an organizational instrument for coordinating a wartime economy; it is not itself a contract to manufacture every aircraft, ship or vehicle associated with the war. The scale of later output must be documented from production and agency records, not inferred as a number from the founding order. Roosevelt’s order; NARA WPB records.

The chairman’s authority reached broad fields: procurement policy, contract and construction coordination, conversion of industry, facilities, financing and priorities. Those headings were directions for federal coordination, not proof that every individual factory decision originated with the chairman. The board had to work through agencies, contractors and later implementing orders. Identifying the difference between a coordinating power and a documented local decision is essential to a fair account of wartime mobilization. EO 9024 operative text.

The order also sat in a rapidly changing administrative sequence. EO 9040, signed eight days later, defined additional functions and altered relationships with existing production offices. A January 16 snapshot is therefore inadequate for a claim about how the board operated throughout 1942, let alone the full war. The founding act and immediate amendment should be read together. EO 9040; EO 9024.

Coordination across agencies and industry

The order called for policy and methods across federal purchasing, contracts, conversion and plant expansion. This explains why war production could affect civilian industry as well as military agencies. A general power to direct priorities does not tell us which firm received a contract or which consumer product was curtailed on a given date. For that, one needs the specific priority rule, contract, agency correspondence and production data. Signed order; Record Group 179.

NARA’s WPB inventory separates central administrative files from industry and commodity-related records. This structure reflects the practical work of translating a broad presidential mandate into material allocations, manufacturing decisions and reports. It is possible to research an individual sector through those series, but the inventory’s existence does not validate an unqualified claim that the board alone caused every wartime production increase. The underlying capacity, labor, finance and military demand also mattered. National Archives RG 179.

Later EO 9125 added functions, duties and powers. Its existence is a direct warning against assigning all subsequent WPB powers to EO 9024. For a legal claim about a 1943 restriction, read the order and rules in force then. An explanatory guide can trace the expansion without rewriting the 1942 founding text as though it already contained every later provision. EO 9125; EO 9024.

Authority, evidence and measurable results

The WPB’s role in allocating scarce materials and directing conversion is evident from its remit and surviving administrative records. Measuring the effects of any rule is harder. A production total must specify the product, date range and source; a shortage may reflect several interacting causes. The order cannot establish how a particular household or business experienced rationing. Those outcomes require contemporaneous rules, price or supply records and local evidence. WPB archive; founding order.

The chairman and board could set coordination policy, but statutory procurement and war powers were distributed across government. A board directive and a military contract had different legal forms. That is why the guide avoids depicting EO 9024 as direct nationalization of all factories. It created federal coordination and powers to direct production under wartime authorities; private firms and other agencies remained actors in the system. EO 9024; NARA RG 179.

A specific industrial story should follow a chain: board policy, implementing directive, agency or contractor action, and measured output. Skipping stages can make an order appear to have delivered a physical product at the moment of signature. The archival guide offers several record series for testing that chain. It also helps distinguish a planned conversion from one actually completed. NARA WPB records.

The postwar handoff

Truman’s EO 9638 dealt with the termination of the War Production Board and transfer of remaining functions in 1945. The transition followed the end of fighting but was not identical to it. Winding down orders, contracts, inventories and controls required administrative decisions after the original emergency changed. The board’s end as an institution and the continuation of selected responsibilities are therefore different facts. Truman EO 9638; NARA history.

A later successor office did not make the WPB a permanent modern agency. Its records remain crucial to studying mobilization, but current production and procurement rules arise from other authorities. The 1942 order is a historical starting point for an emergency board, not a standing instruction to modern manufacturers. Record Group 179; EO 9638.

The order’s significance is the presidential coordination of wartime production under a single board amid multiple existing institutions. It is possible to recognize that role while keeping later amendments, statutory powers, individual contracts and postwar transfers distinct. That makes the chronology useful for readers investigating a factory, product or policy without treating a single January document as the whole war economy. EO 9024; EO 9040; EO 9638.

The life of a wartime production directive

A WPB policy could pass through several stages before altering production: an identified shortage or demand, board decision, implementing rule, agency or firm response, and measured output. EO 9024 empowered the board’s coordination, but it does not print the details of every subsequent directive. A study of a named material or product should therefore use the relevant WPB series in Record Group 179. EO 9024; NARA RG 179.

The Office of Production Management and other wartime offices formed part of the institutional context. EO 9040’s rapid follow-up helps identify what changed between initial creation and operational definition. The difference is not a technicality: a later instruction may shift reporting lines or add a power a January 16 summary would miss. EO 9040; EO 9024.

A factory’s wartime conversion was an event involving owners, workers, suppliers, contracts and federal priorities. The executive order names high-level responsibilities, not the full history of any one plant. Evidence about conversion dates, capacity and output belongs in company, agency and procurement records. This prevents the guide from assigning unsupported production figures to a national coordinating order. WPB archives.

EO 9125 later added functions and powers. A restriction dated after that order must be analyzed under the full contemporary legal framework, not merely the first charter. This is a particular problem with highly visible wartime controls: the public often associates them with WPB generally, while the formal authority and implementing rule may be more specific. EO 9125; NARA records.

Truman’s EO 9638 transferred or disposed of remaining functions after the war. An agency can cease to exist while contracts, supplies and controls still need administration. A termination date therefore should not be represented as the instantaneous end of every task the agency once performed. The postwar order is the primary source for the transition. EO 9638.

The WPB’s legacy lies in a wartime system of coordinated priorities and industrial mobilization. Its founding order is indispensable to explaining the chain of authority, but actual results require production records and later legal changes. The distinction yields a more useful account than either a heroic production total with no source or a purely textual reading that ignores the board’s operating archives. EO 9024; NARA RG 179.

How to attribute production decisions

The WPB’s broad mandate made it central to wartime coordination, but a named factory’s output depended on material allocations, plant capacity, workers and contracts. A chart of national production is therefore not a direct measure of EO 9024 alone. To attribute a decision, identify the board directive and the agency or firm action that followed. Founding order; NARA WPB files.

The archival inventory includes sector and commodity records as well as central administration. It lets researchers narrow a question about a scarce input or industrial conversion rather than rely on a general account of wartime mobilization. Some files may record intended plans, others actual production. The distinction is necessary when reporting quantities or dates. Record Group 179.

The succession from EO 9024 to EO 9040 and EO 9125 is relatively rapid. Those later texts show that the board’s legal remit evolved as mobilization developed. A 1942 order summary can describe its start, but it cannot automatically support every later assertion about materials controls or procurement powers. EO 9040; EO 9125.

The 1945 termination and transfer likewise need a separate citation. Some tasks persisted through successor offices even as the board’s institutional life ended. This is why the guide gives an end date for the board and avoids saying every wartime control disappeared at the same instant. Truman EO 9638; NARA administrative history.

Common questions

When did the board end?

EO 9638 was signed October 4, 1945 and abolished the board effective November 3. NARA record.

Did the January order itself contain every later allocation power?

No. EO 9040 and EO 9125 added duties and authority. Later order.

Where can production activity be checked?

NARA maintains the War Production Board record-group inventory. Finding aid.

What happened later

EO 9638 terminated the board and transferred its remaining functions to the Civilian Production Administration in 1945. The wartime board no longer exists.

Evidence timeline

  1. January 16, 1942 EO 9024 established the War Production Board. Source 1
  2. 1945 EO 9638 terminated the board and transferred functions to a civilian successor. Source 2
  3. November 3, 1945 Executive Order 9638 takes effect, terminating the War Production Board and transferring its functions to the Civilian Production Administration. Official source

Why this order matters

The order created a central forum for the federal government’s wartime production demands. The agency’s records show its reach across materials and industries beyond the founding order’s broad language.

Sources and historical records

  1. EO 9024 text — American Presidency Project Institutional text transcription
  2. EO 9638 termination — American Presidency Project Institutional text transcription
  3. National Archives — War Production Board records Official or archival record

Last recorded source review: September 28, 2026. Historical impact and current legal effect are distinct; follow the later sources for the current position.