Executive Order 14262: Strengthening the Reliability and Security of the United States Electric Grid
President: Donald J. Trump
Directed Energy to develop a uniform methodology for identifying reserve shortfalls and to use lawful emergency authorities to keep generation available.
Status: In effect. Is Executive Order 14262 still in effect? Yes. Executive Order 14262 remains in effect. See Federal Register record.

What does Executive Order 14262 do?
Energy had to develop a reserve-risk method and decide case by case whether emergency powers applied.
Reading the operative provisions of Executive Order 14262
EO 14262 asks the Energy Department to establish a uniform way to identify regional electricity reserve shortfalls and to address reliability concerns using existing emergency authorities. It focuses on whether generation resources will be available when demand is high or other disruptions occur. The Federal Register text of EO 14262 directs federal analysis and action; it does not create a new national grid operator or give the President routine control over every generator.
Electric reliability depends on regional markets, utility planning, transmission capacity, fuel availability and operating rules. The order calls for a common assessment methodology so agencies can compare reserve margins and identify risks. A reserve-shortfall finding is not itself proof that a specific plant must remain open. Any emergency order affecting generation must satisfy the governing statute, apply to the covered facility and specify the duration and conditions of the action.
The Department of Energy’s authority under the Federal Power Act includes limited emergency tools, but those tools have statutory triggers and are subject to judicial review. The order’s instruction to use lawful emergency authorities preserves that boundary. A useful implementation record would include the methodology, regional assessment, agency determination and any resulting emergency order. Without those documents, a general statement that grid reliability is a priority does not establish that a particular generating unit was retained or that reliability improved.
The uniform methodology can improve consistency only if regional conditions and data limitations are made visible. Weather, transmission outages, fuel delivery and demand forecasts affect reserve calculations, so assumptions should be stated alongside any finding. The order’s reliability objective is most useful when the analysis identifies both the risk and the specific lawful tool selected to address it.
Before and after
Before the order
Grid reliability was overseen through FERC, NERC, regional operators, utilities and state regulators under existing statutes.
After the order
Energy developed reliability assessments and used existing Federal Power Act and emergency authorities; the order did not transfer all grid authority to the department.
Who had to do what
| Agency / office | Action | Timing / position |
|---|---|---|
| Energy | Develop methodology and identify at-risk regions | 30 days / recurring |
| Energy | Use lawful emergency measures where needed | Case by case |
| Agencies | Prevent premature loss of critical generation | Ongoing |
What happened next
EO 14262 signed.
Legal and source detail
How it works legally
Sections 202(c) and 215 of the Federal Power Act, environmental law, FERC jurisdiction and state authority delimit action. Emergency orders are reviewable and time-specific.
Sources by type
If a source is unavailable, first check the cited publisher or another official repository. The cited publisher remains the authority.
Primary and official sources
Orders, laws, court records and official implementation material.
How we checked this
Last checked against the sources above on September 9, 2026. How we research →